Stay updated on Hastings, Nebraska RFPs

Sign up to get notified when there's something new on the Hastings, Nebraska RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Hastings, Nebraska RFPs page

  1. Check
    3 days ago
    Change Detected
    Summary
    The Active Bids page shows a refreshed visual layout for the bid list while the existing bids appear unchanged.
    Difference
    0.3%
    Check dated 2026-08-22T22:07:16.000Z thumbnail image
  2. Check
    10 days ago
    Change Detected
    Summary
    A new bid entry has been added to the Active Bids list for the Police Department heating boiler replacement (CH 2026-49). It specifies that bidders must provide all materials and labor, identifies the Engineering dept as the point of contact, and lists the bid date as Thursday, August 13, 2026, with a link to view bid information.
    Difference
    2%
    Check dated 2026-08-15T23:35:34.000Z thumbnail image
  3. Check
    17 days ago
    Change Detected
    Summary
    The Active Bids page shows a refreshed design and layout, while the list of bids and their details remains unchanged.
    Difference
    0.3%
    Check dated 2026-08-08T23:13:11.000Z thumbnail image
  4. Check
    24 days ago
    Change Detected
    Summary
    A new bid entry 'ASR Phase IV: Well 17 Dual Pump & Piping HU 2026-73' was added with the bid date Monday, July 27, 2026. At the same time, several items and UI labels were removed or updated, including the 'View Bid Information' link, the 'Engineering' tag, and older bid entries such as 'South Street Concrete Paving-Lincoln Ave to Hastings Ave CH 2026-45' and the Hastings Utilities Natural Gas Supply Needs RFP.
    Difference
    5%
    Check dated 2026-08-01T17:43:00.000Z thumbnail image
  5. Check
    31 days ago
    Change Detected
    Summary
    New bid entries for Lakeview 11th Subdivision projects are added, including the Water & Sanitary Sewer Extension District 2026-1 HU 2026-77 and the Paving Project CH 2026-48, with descriptions and dates; a View Bid Information link accompanies these entries.
    Difference
    3%
    Check dated 2026-07-25T12:46:21.000Z thumbnail image
  6. Check
    38 days ago
    Change Detected
    Summary
    New bid opportunities were added to the Active Bids list, including Warehouse Lower Roof Replacement HU 2026-76 and South Street Concrete Paving-Lincoln Ave to Hastings Ave CH 2026-45, with their posted dates. A previously listed bid, Don Henry Power Center Controls Replacement HU 2026-41, was removed.
    Difference
    7%
    Check dated 2026-07-18T05:59:16.000Z thumbnail image

Stay in the know with updates to Hastings, Nebraska RFPs

Enter your email address, and we'll notify you when there's something new on the Hastings, Nebraska RFPs page.