Stay updated on Hastings, Nebraska RFPs

Sign up to get notified when there's something new on the Hastings, Nebraska RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Hastings, Nebraska RFPs page

  1. Check
    6 days ago
    Change Detected
    Summary
    The Active Bids page no longer shows the 'View Bid Information' links, the 'Engineering' section label, the date 'Wednesday, August 13, 2025', and the bid title 'WEC Unit 1 Turbine & Valve Overhaul HU 2025-89'.
    Difference
    2%
    Check dated 2025-12-09T12:50:26.000Z thumbnail image
  2. Check
    13 days ago
    Change Detected
    Summary
    A new bid entry NDS 5 480V Switchgear Installation HU 2025-140 was added. The previous listing for NDS 5 480V Switchgear Installation was removed.
    Difference
    0.7%
    Check dated 2025-12-02T15:35:48.000Z thumbnail image
  3. Check
    20 days ago
    Change Detected
    Summary
    New bid entries were added for WEC1 Burner Tip Replacement HU 2025-116 (Rebid) and NDS 5 480V Switchgear Installation, with associated details and dates. The HSI Apron Rehabilitation Project was removed from the list.
    Difference
    5%
    Check dated 2025-11-25T10:10:26.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    The Active Bids page removes the 'View Bid Information' link, the 'Engineering' label, the date Thursday, September 25, 2025, and the bid 'K&K & Nebraskan Mobile Parks Fire Mn HU2025-92'.
    Difference
    2%
    Check dated 2025-11-18T03:28:47.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    The Active Bids page shows the same list of bid opportunities as before, with a refreshed visual design. No new bids or removals are visible.
    Difference
    0.4%
    Check dated 2025-11-10T21:37:16.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    Two bid opportunities were removed from the Active Bids page: Install UGD Ducts SE Proj Phase 2 HU 2025-118 (Sept 18, 2025) and Install UGD Ducts SE Proj-G and J St HU2025-119 (Sept 23, 2025). The related 'View Bid Information' and 'Engineering' labels were also removed.
    Difference
    3%
    Check dated 2025-11-03T18:38:53.000Z thumbnail image

Stay in the know with updates to Hastings, Nebraska RFPs

Enter your email address, and we'll notify you when there's something new on the Hastings, Nebraska RFPs page.