Sign up to get notified when there's something new on the Beaufort - Jasper Water & Sewer Authority RFPs page.

SummaryThe open opportunities list now includes the Galvanized Waterline Replacement and Condition Assessment Services solicitations, while Great Swamp Wetlands Monitoring is no longer listed. Closing dates and days remaining are also updated for the displayed opportunities.
SummaryThe open opportunities list adds RFP 2027-RFP-013 for the River Pump Station Rehabilitation Preliminary Engineering Report, with a closing date of January 5, 2027. Days-left values for listed opportunities are also updated.
SummaryThree opportunities were added: Purrysburg Alum Pond Annual Excavation, Russell Bell Bridge Waterline Replacement, and SH24 Pump Station Site and Piping Repair, each with a December 2026 closing date. The days-left count for Great Swamp Wetlands Monitoring changed from 19 to 12.
SummaryThe listing for **2027-RFP-009, Cross-Connection Control and Backflow Program Support Services**, with an October 30, 2026 closing date, is no longer shown. The remaining **2027-RFP-011** opportunity shows 19 days left.
SummaryThe Cross-Connection Control and Backflow Program opportunity now shows 6 days remaining instead of 13, and the Great Swamp Wetlands Monitoring opportunity shows 26 days instead of 33.
SummaryThe listings for BJWSA Strategic Planning Services (2027-RFP-010) and FY 2027 Disaster Recovery & Emergency Services (2027-RFP-008) are no longer shown. The remaining Cross-Connection Control and Great Swamp Wetlands opportunities show 13 and 33 days left, respectively.
Enter your email address, and we'll notify you when there's something new on the Beaufort - Jasper Water & Sewer Authority RFPs page.