Stay updated on Canon City, Colorado Local News

Sign up to get notified when there's something new on the Canon City, Colorado Local News page.
Latest website image capture
Clouds background image

Latest updates to the Canon City, Colorado Local News page

  1. Check
    7 days ago
    Change Detected
    Summary
    New NewsFlash items include Stage 1 Fire Ban, Main Street parking closures and road-work (crack sealing and chip seal), and associated notices. The update also adds Geosmin/MIB Round 3 results, an Email Scam and Phishing Alert, and Royal Gorge Bridge/Park Pass reservations, while older notices such as Stage 2 Fire Ban and earlier water-quality updates were removed.
    Difference
    3%
    Check dated 2026-08-22T16:56:16.000Z thumbnail image
  2. Check
    14 days ago
    Change Detected
    Summary
    New items were added to News Flash including Geosmin and MIB Test Results, a Water Quality Update, and a Traffic Control Plan describing the 2A N 9th Street closure and paving timeline. An older update for 2A N 9th Street – August 7 Update was removed from the list.
    Difference
    4%
    Check dated 2026-08-15T13:58:28.000Z thumbnail image
  3. Check
    21 days ago
    Change Detected
    Summary
    New notices about the 2A North 9th Street project, crack-seal work, and water quality updates have been added, including timelines and guidance for residents. Older updates about North 9th Street construction, splash pad reopening, and water shortage responses have been removed to reflect current information.
    Difference
    8%
    Check dated 2026-08-08T10:45:16.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    Adds detailed updates for the 2A North 9th Street Project (Mystic Avenue to Meadows Avenue), including start times, closures, and the replacement of the Hydraulic Ditch culvert under Mystic and 9th Street. Also includes notices about the Splash Pad reopening and Stage 1 Water Restrictions, reflecting ongoing infrastructure work and drought response.
    Difference
    4%
    Check dated 2026-08-01T11:11:02.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    A new North 9th Street Construction Update posted on July 24, 2026 provides details on paving progress between Mystic Avenue and Fairview Avenue, ongoing road closures, and plans to install a new water main and water services, with the closure extended north to Phay Avenue and notices to affected residents and businesses. The prior update about N 9th Street paving and striping has been removed.
    Difference
    3%
    Check dated 2026-07-25T07:43:31.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    A descriptive paragraph about what News Flash offers and how to subscribe to notifications was added, and a NewsFlash label appears on the page. This clarifies the feature and guides users to receive automatic updates.
    Difference
    0.3%
    Check dated 2026-07-18T01:42:49.000Z thumbnail image

Stay in the know with updates to Canon City, Colorado Local News

Enter your email address, and we'll notify you when there's something new on the Canon City, Colorado Local News page.