Stay updated on Casper College RFPs

Sign up to get notified when there's something new on the Casper College RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Casper College RFPs page

  1. Check
    today
    No Change Detected
  2. Check
    7 days ago
    Change Detected
    Summary
    New ITB/RFP entries and bid results were added for CC621-26 Campus Block Walls, CC620-26 Library/Testing Center Remodel, CC619-26 Residence Hall Snow Melt and Sidewalk Replacement, CC618-26 SH and AH Building Stair Replacement, CC613-26 Wheeler Terrace Demolition Project, CC617-26 Replace Liesinger Hall Rooftop Units, and CC616-26 2026 Asphalt Rehabilitation. Several related items, addenda, and attachments were removed, including entries and attachments for Wheeler Terrace Demolition, Library Remodel, Campus Block Walls, Residence Hall Snow Melt, and Liesinger Hall RTUs, among others.
    Difference
    6%
    Check dated 2026-05-29T07:43:33.000Z thumbnail image
  3. Check
    14 days ago
    Change Detected
    Summary
    CC622-26 now includes Addendum #1 in the current ITB/RFP listings, indicating an updated addendum for the Barn 4 Renovation project.
    Difference
    0.2%
    Check dated 2026-05-22T04:54:45.000Z thumbnail image
  4. Check
    22 days ago
    Change Detected
    Summary
    New bidder materials were added to the Current Open ITBs/RFPs section, including a Job Walk sign-in sheet, Addendum #1 for CC621-26, and Attachments 1–3 (Concrete Paving, Aggregate Base Courses, ADA and Drainage Concrete) for CC621-26 and CC619-26.
    Difference
    1%
    Check dated 2026-05-14T22:58:43.000Z thumbnail image
  5. Check
    36 days ago
    Change Detected
    Summary
    CC622-26 — BARN 4 RENOVATION; RFP #CC615-26 COPY PAPER; CC617-26 — Addendum #1 were added to the Purchasing Department page.
    Difference
    0.6%
    Check dated 2026-04-30T15:55:25.000Z thumbnail image
  6. Check
    43 days ago
    Change Detected
    Summary
    Updated procurement listings with new addenda and a revised bid sheet for CC614-26, and refreshed addendum entries for CC618-26 and CC616-26. The CC614-26 crack sealing section now reflects award/bid details along with the associated updated documents.
    Difference
    2%
    Check dated 2026-04-23T14:49:44.000Z thumbnail image
  7. Check
    50 days ago
    Change Detected
    Summary
    Added new ITBs/RFPs and related attachments (CC621-26, CC620-26, CC619-26, CC614-26, CC610-26) and updated bid results (CC612-26, CC611-26, CC610-26). Removed outdated items and attachments (e.g., Barn #2 concrete, Kiln Yard/Down Spout documents, and locker renovation materials).
    Difference
    10%
    Check dated 2026-04-16T10:42:24.000Z thumbnail image

Stay in the know with updates to Casper College RFPs

Enter your email address, and we'll notify you when there's something new on the Casper College RFPs page.