Stay updated on Casper College RFPs
Sign up to get notified when there's something new on the Casper College RFPs page.

Latest updates to the Casper College RFPs page
- Check6 days agoChange DetectedNew bid-related documents have been added to the Purchasing page: Attachment #1 – Barn #2 Concrete Specification Plans and the CC612-26 Barn #2 Concrete entry. Addendum #1 for the Casper College Locker Room Renovation has also been added, including Attachment #1 CC610-26 Section 6 Bid Form and Attachment #2 — 2026-03-06 CC Locker Room Drawings.SummaryDifference2%

- Check13 days agoNo Change Detected
- Check20 days agoChange DetectedAdded CC611-26 and CC610-26 ITBs/RFPs with Attachments 1–2, photos, site plans, and enclosure/down-spout documents for Kiln Yard and Locker Renovations, plus Addendum #3 and 2025 Prevailing Wage Rates.SummaryDifference2%

- Check34 days agoChange DetectedAdded CC609-26 — CONSTITUENT RELATIONSHIP MANAGEMENT (CRM) SOLUTION with Addendum #1 and Addendum #2. Added CC608-25 — ENCLOSURE KILN YARD MECHANICAL AREA AND DOWN SPOUT NO AWARD/NO BIDS, and removed Attachments 1 and 2.SummaryDifference0.9%

- Check149 days agoChange DetectedRemoved the reference to Twitter; no new content added in its place. The page drops an external social media reference without replacement.SummaryDifference0.1%

- Check199 days agoChange DetectedThe page has been updated to include new attachments related to the mechanical area and security equipment, while some previous attachments and bid results have been removed.SummaryDifference10%

- Check256 days agoChange DetectedThe page has removed the mention of 'SparkTank', which may indicate a significant change in the content or focus of the page.SummaryDifference0.1%

Stay in the know with updates to Casper College RFPs
Enter your email address, and we'll notify you when there's something new on the Casper College RFPs page.