Stay updated on Casper College RFPs
Sign up to get notified when there's something new on the Casper College RFPs page.

Latest updates to the Casper College RFPs page
- ChecktodayNo Change Detected
- Check7 days agoChange DetectedNew ITB/RFP entries and bid results were added for CC621-26 Campus Block Walls, CC620-26 Library/Testing Center Remodel, CC619-26 Residence Hall Snow Melt and Sidewalk Replacement, CC618-26 SH and AH Building Stair Replacement, CC613-26 Wheeler Terrace Demolition Project, CC617-26 Replace Liesinger Hall Rooftop Units, and CC616-26 2026 Asphalt Rehabilitation. Several related items, addenda, and attachments were removed, including entries and attachments for Wheeler Terrace Demolition, Library Remodel, Campus Block Walls, Residence Hall Snow Melt, and Liesinger Hall RTUs, among others.SummaryDifference6%

- Check14 days agoChange DetectedCC622-26 now includes Addendum #1 in the current ITB/RFP listings, indicating an updated addendum for the Barn 4 Renovation project.SummaryDifference0.2%

- Check22 days agoChange DetectedNew bidder materials were added to the Current Open ITBs/RFPs section, including a Job Walk sign-in sheet, Addendum #1 for CC621-26, and Attachments 1–3 (Concrete Paving, Aggregate Base Courses, ADA and Drainage Concrete) for CC621-26 and CC619-26.SummaryDifference1%

- Check36 days agoChange DetectedCC622-26 — BARN 4 RENOVATION; RFP #CC615-26 COPY PAPER; CC617-26 — Addendum #1 were added to the Purchasing Department page.SummaryDifference0.6%

- Check43 days agoChange DetectedUpdated procurement listings with new addenda and a revised bid sheet for CC614-26, and refreshed addendum entries for CC618-26 and CC616-26. The CC614-26 crack sealing section now reflects award/bid details along with the associated updated documents.SummaryDifference2%

- Check50 days agoChange DetectedAdded new ITBs/RFPs and related attachments (CC621-26, CC620-26, CC619-26, CC614-26, CC610-26) and updated bid results (CC612-26, CC611-26, CC610-26). Removed outdated items and attachments (e.g., Barn #2 concrete, Kiln Yard/Down Spout documents, and locker renovation materials).SummaryDifference10%

Stay in the know with updates to Casper College RFPs
Enter your email address, and we'll notify you when there's something new on the Casper College RFPs page.