Stay updated on Casper College RFPs
Sign up to get notified when there's something new on the Casper College RFPs page.

Latest updates to the Casper College RFPs page
- Check4 days agoNo Change Detected
- Check11 days agoChange DetectedA new entry CC624-26 – HELPDESK ENTERPRISE SERVICE DESK SYSTEM has been added to the Current Open ITBs/RFPs list on the Purchasing Department page. The update signals a new procurement opportunity for vendors and internal users reviewing bidding opportunities.SummaryDifference0.2%

- Check18 days agoChange DetectedThe page underwent a redesign with an updated header and expanded navigation, adding quick-links such as Campus Resources and Your Life, Your College, Your Future. The underlying Purchasing content and contact details remain, preserving core information while the layout is refreshed.SummaryDifference23%

- Check25 days agoNo Change Detected
- Check53 days agoChange DetectedNew ITBs/RFPs and awards were posted (CC623-26 — Casper College Roof Hyrant Installation with attachments; CC615-26 — COPY PAPER — AWARDED TO WYOMING OFFICE PRODUCTS; CC615-26 — BID SHEET; CC622-26 — BARN 4 RENOVATION — AWARDED TO SCS INC.; CC622-26 – BID RESULTS; CC609-26 — CONSTITUENT RELATIONSHIP MANAGEMENT (CRM) SOLUTION — AWARDED TO ELEMENT 451). Obsolete or superseded items and related addenda were removed (CC609-26 — CONSTITUENT RELATIONSHIP MANAGEMENT (CRM) SOLUTION; RFP CC615-26 COPY PAPER; CC622-26 — BARN 4 RENOVATION; CC622-26 – Addendum #1; Job Walk sign in sheet; Addendum #1; Addendum #2; Addendum #3).SummaryDifference2%

- Check68 days agoChange DetectedNew ITB/RFP entries and bid results were added for CC621-26 Campus Block Walls, CC620-26 Library/Testing Center Remodel, CC619-26 Residence Hall Snow Melt and Sidewalk Replacement, CC618-26 SH and AH Building Stair Replacement, CC613-26 Wheeler Terrace Demolition Project, CC617-26 Replace Liesinger Hall Rooftop Units, and CC616-26 2026 Asphalt Rehabilitation. Several related items, addenda, and attachments were removed, including entries and attachments for Wheeler Terrace Demolition, Library Remodel, Campus Block Walls, Residence Hall Snow Melt, and Liesinger Hall RTUs, among others.SummaryDifference6%

- Check75 days agoChange DetectedCC622-26 now includes Addendum #1 in the current ITB/RFP listings, indicating an updated addendum for the Barn 4 Renovation project.SummaryDifference0.2%

- Check82 days agoChange DetectedNew bidder materials were added to the Current Open ITBs/RFPs section, including a Job Walk sign-in sheet, Addendum #1 for CC621-26, and Attachments 1–3 (Concrete Paving, Aggregate Base Courses, ADA and Drainage Concrete) for CC621-26 and CC619-26.SummaryDifference1%

Stay in the know with updates to Casper College RFPs
Enter your email address, and we'll notify you when there's something new on the Casper College RFPs page.