Stay updated on Charlottetown, Prince Edward Island RFPs
Sign up to get notified when there's something new on the Charlottetown, Prince Edward Island RFPs page.

Latest updates to the Charlottetown, Prince Edward Island RFPs page
- Check3 days agoChange DetectedAdded a new RFQ for Hostile Vehicle Mitigation Barricades (File 2025-079) with posting November 6, 2025 and deadline November 21, 2025, including Addendum 1.pdf. Removed the Charlottetown Pollution Control Plant Chemicals RFQ (File 2025-076) with posting October 17, 2025 and deadline October 31, 2025, including Addendum 1.pdf.SummaryDifference4%

- Check10 days agoChange DetectedTwo new tender entries have been added: Snow Clearing of Simmons Sports Center (posted Oct 28, 2025; deadline Nov 12, 2025; PDF: 2025-078 Snow Clearing of Simmons.pdf) and Reconciliation Roadmap Phase 1: Indigenous Partner Engagement and Scoping (posted Oct 27, 2025; deadline Nov 28, 2025; PDFs: 2025-077 Reconciliation Roadmap Phase 1- Indigenous Partner Engagement and Scoping.pdf, 2025-076 Addendum 1.pdf). The entries Pownal Parkade Sprinkler System Upgrade and 7 Mt Edward Road Priority 1 Upgrades (including Addendum 2, Drawings, and Addendum 1) have been removed.SummaryDifference4%

- Check18 days agoNo Change Detected
- Check25 days agoChange DetectedAdds new projects (85 Euston Street, Pownal Parkade sprinkler upgrade, truck hire for snow hauling) and related files; removes several existing RFQs and project notices (Simmons turf, fine bubble aeration, water/sewer maintenance, and related 85 Euston Street documents).SummaryDifference53%

- Check32 days agoChange DetectedAdds new procurement items (Bus Stop Improvements 2025; Truck Hire for Snow Hauling 2025-2026) with dates and files; removes existing items (Annual Sewer Main Maintenance; Removal of Three Residential Structures) and their addenda.SummaryDifference68%

- Check40 days agoChange DetectedNew project documents and addenda have been added (including Fine Bubble Aeration installation and 85 Euston Street scope) with associated dates; no deletions were found.SummaryDifference12%

- Check47 days agoChange DetectedMajor additions include sewer maintenance programs, new engineering services for Simmons Artificial Turf, and removal projects, along with associated dates and file references. Several previously listed projects (street resurfacing, drainage upgrades, storage cabinets, and a communications audit) have been removed.SummaryDifference43%

Stay in the know with updates to Charlottetown, Prince Edward Island RFPs
Enter your email address, and we'll notify you when there's something new on the Charlottetown, Prince Edward Island RFPs page.