Stay updated on Effingham, Illinois RFPs

Sign up to get notified when there's something new on the Effingham, Illinois RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Effingham, Illinois RFPs page

  1. Check
    6 days ago
    Change Detected
    Summary
    Adds new bid notices and related downloads for Public Works and Water Treatment Plant Chemicals, including opening dates. Removes the Spring cleanup at Oakridge Memorial Cemetery notice and the Effingham 2050 Comprehensive Plan update from the page.
    Difference
    1%
    Check dated 2026-02-19T04:48:49.000Z thumbnail image
  2. Check
    13 days ago
    Change Detected
    Summary
    Added: Spring cleanup at Oakridge Memorial Cemetery (March 2–27) and an updated Effingham 2050 Comprehensive Plan (effective February 3). Deleted: HMP Survey invitation and a note about the updated Comprehensive Plan with a link to the draft.
    Difference
    0.3%
    Check dated 2026-02-12T01:53:49.000Z thumbnail image
  3. Check
    20 days ago
    Change Detected
    Summary
    Added references to the HMP survey and the updated Effingham 2050 Comprehensive Plan with a draft review link. Removed the public meeting timeline and details for the Plan.
    Difference
    0.4%
    Check dated 2026-02-04T23:58:42.000Z thumbnail image
  4. Check
    27 days ago
    Change Detected
    Summary
    Added a timeline and date for the Effingham 2050 Comprehensive Plan public meetings, including the next meeting on January 29 at 6:00 p.m. at City Hall with a link to view the Plan and meetings. Removed CSO Reports and CSO-related documents from the Bid notices and tabulations page and updated wording about the Comprehensive Plan draft.
    Difference
    0.3%
    Check dated 2026-01-28T21:44:41.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    CSO Reports and CSO Plans, along with a timeline and links for the Effingham 2050 Comprehensive Plan meetings, have been added. A Public Works bid tabulation for Evergreen Avenue Box Culvert Replacement Project was added, and outdated postings about the comprehensive plan were removed.
    Difference
    2%
    Check dated 2026-01-21T06:57:09.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    An announcement about the Effingham 2050 Comprehensive Plan in final draft with a link to view it and a Homestretch Timeline was added, and the Santa Run Community Survey and its feedback prompt were removed.
    Difference
    0.4%
    Check dated 2026-01-14T04:23:26.000Z thumbnail image

Stay in the know with updates to Effingham, Illinois RFPs

Enter your email address, and we'll notify you when there's something new on the Effingham, Illinois RFPs page.