Stay updated on Fisk University RFPs
Sign up to get notified when there's something new on the Fisk University RFPs page.

Latest updates to the Fisk University RFPs page
- Check5 days agoChange DetectedNew bid entries added: Parchman's Construction Company – Industrial Park Water Storage Tank II ($4,583,840.11), Herbi-Systems – Chemical Weed Control Services ($146,236.05), Core and Main – Manhole Frame Risers Contract ($67,102.40), Power Equipment Company – ITB 6881 Compact Track Loader ($90,583.33), Professional Sign Services – Outdoor LED Marquee Sign (RFP) ($83,650.00). Several prior bid entries removed: Cnz316 (Volunteer Paving), Cnz313 (Rogers Group Inc.), Cnz320 (Summers Taylor, Inc), Cnz321 (W-L Construction & Paving, Inc), Cnz128 (W-L Construction & Paving, Inc).SummaryDifference15%

- Check12 days agoChange DetectedAdds new bid results with vendor names and bid amounts for multiple Tennessee projects, and removes several older bid entries.SummaryDifference15%

- Check19 days agoChange DetectedNew bid entries have been added for four projects: Alamex Inc (Park Benches), Whaley Construction (Curb Cuts), On Duty Depot (Police vehicle equipment), and Permatile Concrete Pipe Co (Concrete Culverts). Four existing bid entries have been removed: Rogers Group, C & C Contracting, Hawkins & Price LLC, and Washburn Envelope.SummaryDifference15%

- Check26 days agoChange DetectedNew bid results were posted for multiple Tennessee road projects with bidders and bid amounts; several previously listed bids and bidders were removed.SummaryDifference15%

- Check33 days agoChange DetectedAdded two bid results: Consolidated Pipe and Supply Company as low bidder on Gas Expansion Joints (Control #3984) in Tennessee at $26,000, and Kessler Creative LLC as low bidder on the Summary Annual Report for Group Welfare Benefit Plan, November 2025 in Tennessee at $1,350. Deleted two mowing-related bid entries: Ace Clearing & Construction on 020 CNZ714 R2BVAR-M3-055 Mowing in Tennessee at $802,288 and Big Al Mowing, LLC on 021 CNZ715 R3SVAR-M3-101, R3SVAR-M3-102 Mowing and Litter removal in Tennessee at $412,412.SummaryDifference3%

- Check41 days agoChange DetectedNew bidder entries and bid amounts were added for multiple contracts, and several bidders were removed from the listings. These changes update the current procurement landscape for Fisk University projects.SummaryDifference15%

Stay in the know with updates to Fisk University RFPs
Enter your email address, and we'll notify you when there's something new on the Fisk University RFPs page.