Stay updated on Framingham, Massachusetts RFPs

Sign up to get notified when there's something new on the Framingham, Massachusetts RFPs page.

https://www.framinghamma.gov/Bids.aspx

Latest updates to the Framingham, Massachusetts RFPs page

  1. Check 6 days agoChange Detected

    SummaryThe bid list decreased from four postings to two: the Nuisance Aquatic Vegetation Management and Automotive & Light Duty Vehicle Body Repair notices were removed, leaving the Cameron Middle School Fire Alarm Upgrade and Carol Getchell Trail Construction – Phase II bids. A Permits link was also added to the site navigation.

    Difference2%
    Check dated 2026-11-21T10:46:49.000Z thumbnail
  2. Check 13 days agoChange Detected

    SummaryThe city added a Carol Getchell Trail Construction – Phase II solicitation (Bid No. 9278), closing December 3, 2026, and removed the Cushing Memorial Chapel Accessible Walkway Project listing, which had been due November 12, 2026.

    Difference0.4%
    Check dated 2026-11-14T11:18:25.000Z thumbnail
  3. Check 20 days agoChange Detected

    SummaryThe DPW Office Trailer Roof Replacement Project posting, which had a November 4, 2026 closing date, is no longer listed. The page now shows four bids instead of five.

    Difference0.9%
    Check dated 2026-11-07T11:18:39.000Z thumbnail
  4. Check 27 days agoChange Detected

    SummaryFramingham added an open bid for nuisance aquatic vegetation management services for city ponds and the Sudbury River, closing November 19, 2026. The postings list now contains five bids.

    Difference1%
    Check dated 2026-10-31T10:19:46.000Z thumbnail
  5. Check 34 days agoChange Detected

    SummaryThe listing expands from one bid to four, adding solicitations for vehicle body repair, a middle school fire alarm upgrade, and an accessible walkway project. Their closing dates range from November 12 to November 23, 2026.

    Difference3%
    Check dated 2026-10-24T11:19:51.000Z thumbnail
  6. Check 41 days agoChange Detected

    SummaryThe listing for installation of radio antennas (Bid 9195, closing October 14, 2026) was replaced by the DPW Office Trailer Roof Replacement Project (Bid 9255), closing November 4, 2026.

    Difference0.5%
    Check dated 2026-10-17T13:58:05.000Z thumbnail

Stay in the know with updates to Framingham, Massachusetts RFPs

Enter your email address, and we'll notify you when there's something new on the Framingham, Massachusetts RFPs page.