Stay updated on Groton, Connecticut RFPs

Sign up to get notified when there's something new on the Groton, Connecticut RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Groton, Connecticut RFPs page

  1. Check
    2 days ago
    Change Detected
    Summary
    The bid listings now include ITB PW 27-09 for roof replacement at the Groton Police Station, opening November 4, 2026, and closing December 10, 2026. The Concrete Walkway Repair at Fitch High School listing, which closed November 2, 2026, has been removed.
    Difference
    0.9%
    Check dated 2026-11-08T05:53:56.000Z thumbnail image
  2. Check
    9 days ago
    Change Detected
    Summary
    The listing for ITB 27-10 Commercial Diesel Zero Turn Riding Mower and its associated dates has been removed. The Concrete Walkway Repair at Fitch High School remains listed.
    Difference
    0.9%
    Check dated 2026-11-01T04:19:13.000Z thumbnail image
  3. Check
    16 days ago
    Change Detected
    Summary
    A bid for concrete walkway repairs at Fitch High School is listed, opening October 20, 2026 and closing November 2, 2026. The GCC baseball and T-ball backstop replacement bid, which had an October 21, 2026 closing date, is no longer listed.
    Difference
    2%
    Check dated 2026-10-25T04:55:20.000Z thumbnail image
  4. Check
    36 days ago
    Change Detected
    Summary
    A bid for a commercial diesel zero-turn riding mower is listed, opening September 28, 2026 and closing October 26, 2026. The listing for interior and exterior repairs at 152 Noank Ledyard Road, with its August 27–September 30, 2026 dates, is no longer shown.
    Difference
    2%
    Check dated 2026-10-04T08:12:36.000Z thumbnail image
  5. Check
    43 days ago
    Change Detected
    Summary
    Two new bid listings were added to Bid Listings: ITB 27-09 GCC Baseball and T-Ball Backstop Replacement (opening Sept 23, 2026 8:00 AM; closing Oct 21, 2026 2:00 PM) and ITB HR-2025-02 – 152 Noank Ledyard Road Interior and Exterior Repairs (opening Aug 27, 2026 8:00 AM; closing Sept 30, 2026 2:00 PM).
    Difference
    0.9%
    Check dated 2026-09-27T07:50:18.000Z thumbnail image
  6. Check
    51 days ago
    Change Detected
    Summary
    Several bid listing entries were deleted, including ITB HR-2025-04 – 14 Valley Rd Interior and Exterior Repairs Revised Dates and ITB 27-06 Shennecossett Golf Course PreFab Restroom Facility. This reduces the number of active opportunities and updates the scheduling information shown on the Bid Listings page.
    Difference
    2%
    Check dated 2026-09-20T03:46:51.000Z thumbnail image

Stay in the know with updates to Groton, Connecticut RFPs

Enter your email address, and we'll notify you when there's something new on the Groton, Connecticut RFPs page.