Stay updated on Guidepost Montessori Job Board

Sign up to get notified when there's something new on the Guidepost Montessori Job Board page.
Latest website image capture
Clouds background image

Latest updates to the Guidepost Montessori Job Board page

  1. Check
    2 days ago
    Change Detected
    Summary
    The Guidepost Montessori openings were updated: listings now include roles such as Bilingual Assistant Teacher and Child Care Assistant Teacher in additional locations, while some previously listed roles and locations are no longer shown. The total number of displayed jobs changed from 209 to 205.
    Difference
    13%
    Check dated 2026-11-12T19:23:13.000Z thumbnail image
  2. Check
    9 days ago
    Change Detected
    Summary
    The listed openings increased from 197 to 210, with roles and locations added or removed. New listings include an Administrative Assistant in Mill Valley and an Assistant Montessori Teacher for a Toddler Community; Bilingual Assistant Teacher and other listings were removed.
    Difference
    22%
    Check dated 2026-11-05T21:26:35.000Z thumbnail image
  3. Check
    16 days ago
    Change Detected
    Summary
    Guidepost Montessori’s listings now show 196 openings instead of 210. The displayed roles and locations changed, including an Assistant Teacher opening in Beaverton and a Bilingual Assistant Teacher opening in Charlotte, while some previously listed job titles no longer appear.
    Difference
    10%
    Check dated 2026-10-29T20:17:21.000Z thumbnail image
  4. Check
    23 days ago
    Change Detected
    Summary
    The listings now show 210 openings, including roles such as Afternoon Teacher and Assistant Teacher / Montessori Guide (Spanish Immersion), with changes to several job locations. Some previously listed positions and locations, including a Floating Early Education Administrator role in Maryland, are no longer shown.
    Difference
    19%
    Check dated 2026-10-22T22:34:49.000Z thumbnail image
  5. Check
    30 days ago
    Change Detected
    Summary
    The listed openings increased from 224 to 225, with roles and locations added or removed. New listings include an Assistant Montessori Teacher and a Floating Early Education Administrator in Maryland, while openings in Hollywood Beach, Florida, and Kent, Washington, were removed.
    Difference
    7%
    Check dated 2026-10-15T21:38:17.000Z thumbnail image
  6. Check
    44 days ago
    Change Detected
    Summary
    A new Assistant Spanish Teacher position in Downtown Naperville, Illinois was added and the total listings are shown as 224. Deletions include 223 jobs, Beaverton, Oregon, the Child Care Assistant Teacher listing, and the St. Louis, Missouri listing.
    Difference
    9%
    Check dated 2026-10-01T20:43:28.000Z thumbnail image

Stay in the know with updates to Guidepost Montessori Job Board

Enter your email address, and we'll notify you when there's something new on the Guidepost Montessori Job Board page.