Stay updated on Hobbs, New Mexico RFPs

Sign up to get notified when there's something new on the Hobbs, New Mexico RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Hobbs, New Mexico RFPs page

  1. Check
    today
    Change Detected
    Summary
    The bid-results listings now include Crosstown Construction & Trucking, LLC as the low bidder for the Cole Village Infrastructure Relocation project at $3,924,496.00, while the listing for Ace Hardware of Farmington’s electrical-supplies bid at $4,546.70 is no longer shown.
    Difference
    0.8%
    Check dated 2026-10-24T18:18:45.000Z thumbnail image
  2. Check
    7 days ago
    Change Detected
    Summary
    Two solicitations are listed: airport drainage and erosion-control reconstruction due February 5, 2027, and furnishing medications for HAAC due October 29, 2026. The bid-results section is also refreshed with new low-bid awards replacing older listings.
    Difference
    10%
    Check dated 2026-10-17T18:39:34.000Z thumbnail image
  3. Check
    21 days ago
    Change Detected
    Summary
    New low-bid results are listed for a municipal wastewater upgrade and electrical supplies, including bidder names and amounts. The Phase 12 waterline replacement solicitation and two older printing bid results are no longer shown.
    Difference
    2%
    Check dated 2026-10-03T18:20:19.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    Two new bidders were added with their bid details for Hobbs procurement listings, increasing supplier options and competitive pricing. At the same time, two bidders were removed from other listings, altering the competitive landscape for those specific opportunities.
    Difference
    2%
    Check dated 2026-09-26T19:55:47.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    New bidders were added to the bid results with their award amounts (Communication Logic, Inc.; Kessler Creative LLC; Mesa Sand and Gravel; Advertising Ideas, Inc.; File Construction, LLC). Several previously listed bidders were removed from the results.
    Difference
    8%
    Check dated 2026-09-19T19:20:43.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    Ace Hardware of Farmington has been added as the Low Bidder on Electrical Supplies for the Warehouse RFQ, with a bid of $4,546.70 USD. Essence Bottling Company of Texas, Inc. has been removed as the Low Bidder on Fqt for Artesia Indoor Range, eliminating their bid of $22,511.25 USD from the results.
    Difference
    0.8%
    Check dated 2026-09-12T20:00:20.000Z thumbnail image

Stay in the know with updates to Hobbs, New Mexico RFPs

Enter your email address, and we'll notify you when there's something new on the Hobbs, New Mexico RFPs page.