Stay updated on Institute of Design and Construction RFPs
Sign up to get notified when there's something new on the Institute of Design and Construction RFPs page.

Latest updates to the Institute of Design and Construction RFPs page
- Check6 days agoChange DetectedNavigation links for campus buildings, facilities, contractors, and related resources appear alongside a footer status update from “IT Systems: Operational” to “IT Systems: Degraded.”SummaryDifference5%

- Check13 days agoNo Change Detected
- Check20 days agoChange DetectedThe page includes links to campus buildings and wayfinding, facilities and safety services, and resources for consultants and contractors. The notice directing users to the University of Missouri System website for current construction opportunities remains unchanged.SummaryDifference4%

- Check34 days agoChange DetectedThe site-wide IT systems indicator now reports that services are operational rather than degraded.SummaryDifference0.3%

- Check41 days agoChange DetectedThe footer status indicator changed from “IT Systems: Operational” to “IT Systems: Degraded.”SummaryDifference0.3%

- Check69 days agoChange DetectedFooter text changed from IT Systems: Degraded to IT Systems: Operational. This indicates the site's underlying systems are functioning normally.SummaryDifference0.3%

- Check141 days agoChange DetectedA new IT Systems: Degraded status line appears on the page, signaling reduced system performance and potential access issues for bid-related information.SummaryDifference0.3%

Stay in the know with updates to Institute of Design and Construction RFPs
Enter your email address, and we'll notify you when there's something new on the Institute of Design and Construction RFPs page.