Stay updated on Lowell, Massachusetts RFPs
Sign up to get notified when there's something new on the Lowell, Massachusetts RFPs page.

Latest updates to the Lowell, Massachusetts RFPs page
- ChecktodayChange DetectedThe Bid Postings page was updated with new bid entries (e.g., Collection Systems & Emerg Repairs, Jackson at Marston Project with addenda, Police Vehicles Repair, Water Instrumentation Repairs) and revised deadlines/addenda; several older postings were removed or updated (e.g., Habitat Restoration Project, Bridge Maintenance Repairs, On-Call Water Repairs, Sewer Separation Phase 3A) to reflect current status.SummaryDifference4%

- Check7 days agoChange DetectedThe bid postings list now shows seven active bids, including On-Call Water Repairs (addenda 1 issued - MASSDOT required) and Sewer Seperation Phase 3A (appendices added, addenda 4 issued), with a new deadline of 5/5/2026 11:00 AM. Older entries and related status fields have been removed to reflect the current, open opportunities.SummaryDifference5%

- Check15 days agoChange DetectedThe bid postings list has been refreshed: new current opportunities (e.g., **OPM Services for the LMA**, **On-Call Water Repairs**, **Bridge Maintenance Repairs**, and **Jackson at Marston Project**) are now shown with their respective open/closing details, while earlier listed bids (including **Demolition of 2 Properties** and other specific bid numbers/deadlines) are no longer in the visible set.SummaryDifference5%

- Check22 days agoChange DetectedAdded Surplus Vehicles for Sale with closing 4/28/2026 and Central Monitoring Fire Boxes bid entries. Brown Street Ramp Project now shows 5 addenda posted.SummaryDifference4%

- Check29 days agoChange DetectedNew bid postings added: WIOA Youth Programs (26-63), Downtown Sewer Improvements (26-65) with addenda, Demolition of 2 Properties (26-62), Localized Pavement Repairs (26-61), and Sewer Separation Phase 3A (26-48) with appendices/addenda; addenda issued for Bridge Rehabilitation Project Designer. Some older bid entries and UI options were removed, including Cemetery Grounds Maintenance and the language/translation options.SummaryDifference5%

- Check36 days agoChange DetectedNew bid postings and addenda were posted, including Bridge Rehabilitation Project Designer (Bid No. 26-59) with a deadline of 4/30/2026 11:00 AM, BROWN STREET RAMP PROJECT-ADDENDUM 3, Cemetery Grounds Maintenance, Sewer Separation Phase 3A appendices, and Sludge Hauling and Disposal - Addendum 3. Several bids and addenda were removed or updated, including 26-54 Polymer, 26-52 Hazardous Materials Removal Services Addendum 1, 26-57 Sewer Separation Phase 3A, and Sludge Hauling and Disposal - Addendum 2.SummaryDifference4%

Stay in the know with updates to Lowell, Massachusetts RFPs
Enter your email address, and we'll notify you when there's something new on the Lowell, Massachusetts RFPs page.