Stay updated on Mansfield, Connecticut RFPs
Sign up to get notified when there's something new on the Mansfield, Connecticut RFPs page.

Latest updates to the Mansfield, Connecticut RFPs page
- Check3 days agoNo Change Detected
- Check11 days agoChange DetectedAdded Bid Tabulation - Animal Control Facility Design Services with status Upon Contract. Removed Renovation to the Mansfield Middle School Cafeteria bid and its closing time of 4/9/2026 2:00 PM.SummaryDifference0.7%

- Check18 days agoNo Change Detected
- Check25 days agoChange DetectedAdded a new bid for Professional & Technical Services for the Design of an Aerated Static Compost System with a 4/30/2026 2:00 PM deadline; removed two draft bid tabulations: Bid Tabulation_South Eagleville Pedestrian Safety Improvements and Bid Tabulation On-Call Tree Service.SummaryDifference2%

- Check32 days agoChange DetectedDifference1%

- Check46 days agoChange Detected1 new bid was added to the Bid Postings page. The Architectural Design for New Animal Control Facility bid entry (2 Bids) and its related fields appear to have been removed.SummaryDifference1%

- Check61 days agoChange DetectedRemoved the bid posting for Chromebooks (Student Chromebooks) by Regional School District #19 and Mansfield Public School District from the Open Bids list under Information Technology.SummaryDifference2%

- Check68 days agoChange DetectedTwo new bid opportunities have been added to the Bid Postings page. The Mansfield Pump Station maintenance bid (3 bids) has been removed.SummaryDifference1%

Stay in the know with updates to Mansfield, Connecticut RFPs
Enter your email address, and we'll notify you when there's something new on the Mansfield, Connecticut RFPs page.