Stay updated on Matanuska-Susitna Borough RFPs
Sign up to get notified when there's something new on the Matanuska-Susitna Borough RFPs page.

Latest updates to the Matanuska-Susitna Borough RFPs page
- Check4 days agoChange DetectedTwo new opportunities (IDs 9 and 23) were added to Open Public Opportunities. Several existing opportunities were removed, including Design Willow Emergency Services Building (26-087P), Construct Palmer High School Elevator Upgrades (26-085B), Station 7-3 Hose Tower Design (26-091P), and Construct Palmer Junior Middle School Elevator Upgrades (26-084B), along with their close dates.SummaryDifference12%

- Check11 days agoChange DetectedMultiple new opportunities were added and several existing opportunities were removed or updated in the procurement portal, including changes to close dates and statuses. These updates affect the available bids and timelines for the listed projects.SummaryDifference9%

- Check18 days agoChange DetectedNew entry Emergency Medical Services System Evaluation (26-092P) with Dec 17, 2025 deadline has been added; several opportunities have been removed or closed, including Snowshoe Elementary School Boiler Replacement and Talkeetna Dike and Revetment.SummaryDifference16%

- Check25 days agoChange DetectedNew opportunities were added, including Station 7-3 Hose Tower Design (26-091P), Supply & Deliver Front-Loading Solid Waste Containers (26-089B), and other listed design and equipment projects with updated close dates. Additionally, Finger Lake Elementary School Boiler Replacement (26-078B) and Sutton Elementary School Boiler System Improvements (26-080B) were removed from the Open Public Opportunities list.SummaryDifference12%

- Check33 days agoChange DetectedNew Open Public Opportunities have been added (e.g., Willow Emergency Services Building design 26-087P; Palmer elevator upgrades 26-085B/26-084B; Iditarod Elementary cladding repair 26-093P) and several existing opportunities were removed (e.g., 26-075B, 26-076B, 26-077B).SummaryDifference23%

- Check40 days agoChange DetectedNew opportunities added: Sutton Boiler System Improvements (26-080B, closes Nov 19, 2025), Finger Lake Elementary Boiler Replacement (26-078B, closes Nov 17, 2025), and Snowshoe Elementary Boiler Replacement (26-079B, closes Nov 18, 2025). Removed opportunities: Station 8-2 Connex Roof Replacement (26-069B) and Purchase Pickup Truck Fleet Vehicles (26-074B).SummaryDifference12%

Stay in the know with updates to Matanuska-Susitna Borough RFPs
Enter your email address, and we'll notify you when there's something new on the Matanuska-Susitna Borough RFPs page.