Stay updated on Mattoon, Illinois RFPs

Sign up to get notified when there's something new on the Mattoon, Illinois RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Mattoon, Illinois RFPs page

  1. Check
    2 days ago
    Change Detected
    Summary
    A new bid entry for the 2026 Pavement Project Evergreen Court has been added with release and due dates and a days-left indicator; the 2026 MFT PCC/CLSM bid has been removed along with its associated dates.
    Difference
    6%
    Check dated 2026-05-07T22:03:54.000Z thumbnail image
  2. Check
    9 days ago
    Change Detected
    Summary
    Three new bid entries were added (3, 14, 22) and several entries were removed or updated (including the '2026 Mattoon Sidewalk Project North 21st' and items 6, 12, 21, 30) with corresponding release and due dates. These updates alter the Open/Closed bid counts and the active opportunities listed on the page.
    Difference
    2%
    Check dated 2026-04-30T16:50:56.000Z thumbnail image
  3. Check
    16 days ago
    Change Detected
    Summary
    Bid/RFP listings were updated on the page, adding bids for the Mattoon Sidewalk Project North 21st, MFT PCC/CLSM, the Express Drive Thru Alley project, and the Broadway Ave Resurface Project with corresponding due dates. A separate set of listings (including older 2026 projects and a prior pavement patching listing) was removed.
    Difference
    4%
    Check dated 2026-04-23T14:36:47.000Z thumbnail image
  4. Check
    23 days ago
    Change Detected
    Summary
    Two new bid entries were added (5 and 9) and five entries were removed (8, 4/14/2026, 3/17/2026, 2026 City of Mattoon Water Treatment Chemicals, and 20).
    Difference
    2%
    Check dated 2026-04-16T10:38:30.000Z thumbnail image
  5. Check
    30 days ago
    Change Detected
    Summary
    Six new bid entries were added to the Open bids list with their due dates (including 2026 Seal Coat, 2026 MFT PCC/CLSM, 2026 HOT MIX ASPHALT, Fort Worth Way Pavement Patching, and 2026 Mattoon Sidewalk Project North 21st). The Title and View columns and the 3/17/2026 release date were removed.
    Difference
    6%
    Check dated 2026-04-09T08:09:08.000Z thumbnail image
  6. Check
    38 days ago
    Change Detected
    Summary
    Release Date, Due Date, and Title labels and their dates were removed from the Bids/RFPs page. The page now includes a search field and Open/Closed filter, with 13 additions reported.
    Difference
    2%
    Check dated 2026-04-02T00:29:10.000Z thumbnail image

Stay in the know with updates to Mattoon, Illinois RFPs

Enter your email address, and we'll notify you when there's something new on the Mattoon, Illinois RFPs page.