Stay updated on Milwaukee Metropolitan Sewerage District RFPs

Sign up to get notified when there's something new on the Milwaukee Metropolitan Sewerage District RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Milwaukee Metropolitan Sewerage District RFPs page

  1. Check
    2 days ago
    No Change Detected
  2. Check
    9 days ago
    Change Detected
    Summary
    New planning and security service items with updated dates and codes replace older entries, updating scheduling and identifiers.
    Difference
    5%
    Check dated 2025-10-13T07:26:00.000Z thumbnail image
  3. Check
    16 days ago
    Change Detected
    Summary
    Added new services and sessions (TS-2737, TS-2735, P-3296, P-3298) with scheduled times; removed an emergency repair project, a vessel replacement project, and a geotechnical/structural analysis contract.
    Difference
    9%
    Check dated 2025-10-06T04:43:00.000Z thumbnail image
  4. Check
    23 days ago
    Change Detected
    Summary
    - Added: Engineering Services - Geotechnical/Structural Analysis of Process-Related, Timber Pile-Supported Structures at the Jones Island Water Reclamation Facility. - Removed: P-3281, Temporary Staffing Services, and Sep 23rd 2025, 2:00 PM CDT.
    Difference
    7%
    Check dated 2025-09-29T01:24:20.000Z thumbnail image
  5. Check
    30 days ago
    Change Detected
    Summary
    The page now adds an active emergency repair entry (with a location and contractor reference) and two timestamps, while removing a prior item and its associated system/operation description. Overall, this indicates a shift from a prior disinfection system entry to a live emergency repair project with scheduled times.
    Difference
    7%
    Check dated 2025-09-21T22:25:54.000Z thumbnail image
  6. Check
    37 days ago
    Change Detected
    Summary
    New October 2025 service slots and tasks added (including diggers hotline assessment, concrete/soil testing, UV disinfection at JIWRF/SSWRF, and switchboards) while older September entries (wet-weather feasibility study and security services) and related codes are removed.
    Difference
    7%
    Check dated 2025-09-14T18:48:09.000Z thumbnail image
  7. Check
    44 days ago
    Change Detected
    Summary
    The page now includes information about the replacement of the Open M08001C01 Water Quality Protection Research Vessel, scheduled for September 30th, 2025, at 10:00 AM CDT.
    Difference
    5%
    Check dated 2025-09-07T13:27:32.000Z thumbnail image

Stay in the know with updates to Milwaukee Metropolitan Sewerage District RFPs

Enter your email address, and we'll notify you when there's something new on the Milwaukee Metropolitan Sewerage District RFPs page.