Stay updated on Newark, Ohio RFPs

Sign up to get notified when there's something new on the Newark, Ohio RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Newark, Ohio RFPs page

  1. Check
    7 days ago
    No Change Detected
  2. Check
    14 days ago
    No Change Detected
  3. Check
    21 days ago
    Change Detected
    Summary
    New Newark solicitations were added (e.g., Thornwood Dr - Faye Dr Intersection Improvements; Arcade - City Hall Parking Lot Improvements; Newark Chemicals 2026; Newark Street Materials 2026; Granville Road Sanitary Sewer Relocation) with updated deadlines and cost estimates. One solicitation was removed.
    Difference
    7%
    Check dated 2026-02-03T23:00:22.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    Added Thornwood Dr - Faye Dr Intersection Improvements solicitation with an engineer's estimate of $5,096,695.61 and a bid deadline of 02/18/2026 07:00 PM UTC. The project includes reconstruction and widening of Thornwood Drive and the construction of a single-lane roundabout at the Faye Drive intersection.
    Difference
    2%
    Check dated 2026-01-27T20:48:40.000Z thumbnail image
  5. Check
    64 days ago
    Change Detected
    Summary
    One solicitation entry from 09/20/2024 04:00 PM UTC for the Raccoon Creek - Cherry Bend Slope Repair was deleted, noting ~200 ft of sheet pile retaining wall with a $750,000 estimate. The total number of solicitations listed is 56.
    Difference
    6%
    Check dated 2025-12-23T01:35:17.000Z thumbnail image
  6. Check
    71 days ago
    Change Detected
    Summary
    Addendum 4 revisions for Newark solicitations include revised cost estimates and the updated bid date of 12/16/2025. The update also includes pre-bid conference details and changes to the project scope and related bid items.
    Difference
    0.8%
    Check dated 2025-12-15T21:45:25.000Z thumbnail image
  7. Check
    107 days ago
    Change Detected
    Summary
    A new solicitation entry was added for the City of Newark, including a mandatory pre-bid conference date, attendance details, and engineer's cost estimates with major work items. The listing references the North Separation Project Phase 1 and related deadlines.
    Difference
    2%
    Check dated 2025-11-10T02:07:38.000Z thumbnail image
  8. Check
    207 days ago
    Change Detected
    Summary
    The page has removed a significant project description related to the Newark Street Resurfacing, including details about the scope of work and the estimated cost.
    Difference
    29%
    Check dated 2025-08-01T19:25:45.000Z thumbnail image

Stay in the know with updates to Newark, Ohio RFPs

Enter your email address, and we'll notify you when there's something new on the Newark, Ohio RFPs page.