Stay updated on Normal, Illinois RFPs

Sign up to get notified when there's something new on the Normal, Illinois RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Normal, Illinois RFPs page

  1. Check
    6 days ago
    Change Detected
    Summary
    A new bid posting for 2026 College Avenue Parking Garage Repair and Maintenance was added with a bid call and deadline of 8/6/2026 2:00 PM, and older bid listings and UI text were removed to reflect the updated postings list.
    Difference
    2%
    Check dated 2026-07-20T00:11:56.000Z thumbnail image
  2. Check
    13 days ago
    Change Detected
    Summary
    New bid postings have been added, including Public Works Interior Renovation with its bid call details and a deadline of 7/15/2026 10:30 AM, and Strategic Plan - Full (PDF) and Strategic Plan - Summary (PDF) with a deadline of 7/22/2026 11:59 PM. Outdated bid postings and references have been removed to reflect current opportunities, including entries like Linden Street Dungeon Barrel Roof Overlay and Uptown Station Emergency Circuit Conversion.
    Difference
    5%
    Check dated 2026-07-12T19:43:40.000Z thumbnail image
  3. Check
    20 days ago
    Change Detected
    Summary
    A new bid entry '2026 MFT Street Resurfacing, MFT Section 26-00000-00-GM' was added with a bid call and closing time of 7/14/2026 2:00 PM, and the older '2026 General Street Resurfacing' entry was removed with a closing time of 6/30/2026 1:30 PM.
    Difference
    0.5%
    Check dated 2026-07-05T14:30:32.000Z thumbnail image
  4. Check
    27 days ago
    Change Detected
    Summary
    New bid postings were added, including Uptown Station Emergency Circuit Conversion, Normal Fire Department Headquarters – Concrete Pad, HVAC Filter Procurement, and Linden Street Dungeon Barrel Roof Overlay, with their deadlines and details. Two previously listed bids, 2026 Crack and Joint Filling and Vernon Avenue Water Main Improvements, were removed.
    Difference
    5%
    Check dated 2026-06-28T08:29:20.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    Updated the 2026 General Street Resurfacing bid entry to include the Open status, closing date/time, a 'Read on' link, and updated the bid count from 1 Bid to 2 Bids.
    Difference
    1%
    Check dated 2026-06-21T05:21:47.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    New bid postings have been added for 2026 Crack and Joint Filling, 2026 Sewer Rehabilitation Phase 1, and Vernon Avenue Water Main Improvements, with their statuses and closing dates shown. The listing for College Avenue Parking Deck-Surface Lot Expansion was removed.
    Difference
    2%
    Check dated 2026-06-14T03:14:29.000Z thumbnail image

Stay in the know with updates to Normal, Illinois RFPs

Enter your email address, and we'll notify you when there's something new on the Normal, Illinois RFPs page.