Stay updated on Parkway Schools RFPs

Sign up to get notified when there's something new on the Parkway Schools RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Parkway Schools RFPs page

  1. Check
    6 days ago
    Change Detected
    Summary
    Additions introduce a new renovation project entry and a new event date; deletions remove an existing equipment service entry and two chemical/product entries with their dates. The update signals a shift in focus from older items to the renovation project and its schedule.
    Difference
    6%
    Check dated 2025-10-19T16:33:30.000Z thumbnail image
  2. Check
    13 days ago
    Change Detected
    Summary
    Removed: Propylene Glycol entry (26-46) and associated Oct 15, 2025 3:00 PM CDT; Replaced with: new listings for Open 26-37R Large Equipment Parts & Service (Oct 24, 2025, 3:00 PM CDT), Open 26-46 Propylene Glycol (Oct 15, 2025, 3:00 PM CDT) with a new 26-46 entry, plus new items 26-49 (District Demographic Study) and 26-47 (Facilities Condition Assessment) with Oct 21, 2025, 3:00 PM CDT.
    Difference
    6%
    Check dated 2025-10-12T14:40:36.000Z thumbnail image
  3. Check
    20 days ago
    Change Detected
    Summary
    New items with scheduled dates have been added (Mason Ridge project, Road Salt, Propylene Glycol), while several older entries (including a related Highcroft Ridge project and some equipment/materials) have been removed.
    Difference
    6%
    Check dated 2025-10-05T10:21:35.000Z thumbnail image
  4. Check
    27 days ago
    Change Detected
    Summary
    Updated schedule and project listings: removing 'Graduation Materials' dated Sep 25, 2025, and adding new entries for Oct 2 and Oct 21, 2025, with a new project title; older item 26-32 is replaced by 26-44.
    Difference
    6%
    Check dated 2025-09-28T03:21:30.000Z thumbnail image
  5. Check
    34 days ago
    Change Detected
    Summary
    Adds new project/product entries and upcoming event times; removes several older items and past dates to streamline the page.
    Difference
    6%
    Check dated 2025-09-20T22:07:50.000Z thumbnail image
  6. Check
    41 days ago
    Change Detected
    Summary
    Two new items with scheduled times were added—Graduation Materials (Sep 25, 2025 3:00 PM CDT) and Building Renovation, Site Improvements and Abatement (Highcroft Ridge School) (Sep 30, 2025 2:00 PM CDT)—and two items were removed—Field & Traffic Marking Paint (Sep 9, 2025 3:00 PM CDT) and Graduation Flowers (Sep 10, 2025 3:00 PM CDT). This signals a shift from flowers and marking services to materials and a major renovation project, with updated time slots.
    Difference
    2%
    Check dated 2025-09-13T17:35:45.000Z thumbnail image

Stay in the know with updates to Parkway Schools RFPs

Enter your email address, and we'll notify you when there's something new on the Parkway Schools RFPs page.