Stay updated on Pendleton, Oregon RFPs

Sign up to get notified when there's something new on the Pendleton, Oregon RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Pendleton, Oregon RFPs page

  1. Check
    6 days ago
    No Change Detected
  2. Check
    13 days ago
    Change Detected
    Summary
    The Bids and RFPs page changed from displaying an active RFP (with posted and closing dates) to showing a message that there are no bids or RFPs available.
    Difference
    4%
    Check dated 2025-12-23T08:08:28.000Z thumbnail image
  3. Check
    20 days ago
    Change Detected
    Summary
    The list now shows 'Displaying 1 - 1 of 1' instead of 'Displaying 1 - 2 of 2', and the RFQ: Electromagnetic Denial Test Range (EDTR) entry and its closing dates were removed.
    Difference
    2%
    Check dated 2025-12-16T02:31:41.000Z thumbnail image
  4. Check
    27 days ago
    No Change Detected
  5. Check
    35 days ago
    Change Detected
    Summary
    1-2 of 2 items are now displayed, removing the SE Rees-Goad Way Extension Project from the list. The 'Open Until Filled' status is no longer shown, and the page no longer displays 1-3 of 3.
    Difference
    2%
    Check dated 2025-12-01T15:19:41.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    Three new opportunities have been added to the Bids and RFPs list (RFP: SEIU Compensation Study; RFQ: Electromagnetic Denial Test Range; SE Rees-Goad Way Extension Project) with their posted and closing dates, and the Reservoir Coating Project listing was removed; the listing now shows 1-3 of 3 items.
    Difference
    3%
    Check dated 2025-11-24T04:11:19.000Z thumbnail image
  7. Check
    64 days ago
    Change Detected
    Summary
    The Bids and RFPs table now shows two items: the existing 2025 Reservoir Coating Project and a new SE Rees-Goad Way Extension Project. The list displays 1-2 of 2 results with updated posted dates and an Open Until Filled status.
    Difference
    2%
    Check dated 2025-11-02T07:37:00.000Z thumbnail image
  8. Check
    78 days ago
    Change Detected
    Summary
    Replaces general procurement notes with a specific Reservoir Coating Project posting, including posting and closing dates; removes survey and lack of bids notices.
    Difference
    44%
    Check dated 2025-10-19T00:30:57.000Z thumbnail image

Stay in the know with updates to Pendleton, Oregon RFPs

Enter your email address, and we'll notify you when there's something new on the Pendleton, Oregon RFPs page.