Stay updated on Redding, California RFPs

Sign up to get notified when there's something new on the Redding, California RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Redding, California RFPs page

  1. Check
    7 days ago
    Change Detected
    Summary
    Added two new bid opportunities (5679: Seasonal Rental of One 8-Ton Excavator open Feb 17, 2026; 5676: Engineering Services for Storm Drain Master Plan Update open Mar 18, 2026). Deleted outdated listings (5670: White 20# Bond Bulk Paper; 5666: Construction Management Services for Westside Road Bridge project Addendum No. 1 issued 2/4/2026; removal date Feb 13, 2026).
    Difference
    4%
    Check dated 2026-02-18T06:52:07.000Z thumbnail image
  2. Check
    14 days ago
    Change Detected
    Summary
    Added 5677 - Miscellaneous Vehicle Glass Repair/Replacement (Open Feb 9, 2026) and 5666 - Construction Management Services for Westside Road Bridge over Canyon Hollow Creek (Addendum No. 1 issued 2/4/2026; Open 2/13/2026). Removed 5669 - Single-Phase Solid State Watt-Hour Meters and the earlier 5666 entry (as of Feb 6, 2026).
    Difference
    3%
    Check dated 2026-02-11T04:43:04.000Z thumbnail image
  3. Check
    21 days ago
    Change Detected
    Summary
    Bid 5668 - Heated Blower Regeneration Desiccant Air Dryer has been removed from the Bid Opportunities list, including its associated open date and status entries.
    Difference
    1%
    Check dated 2026-02-04T04:13:34.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    New bid opportunities added: 5672 - Insulators, Pins, Braces and Guy Assemblies (Open 01/26/2026, Closes 02/19/2026) and 5670 - White 20# Bond Bulk Paper (Open 01/21/2026, Closes 02/11/2026). An older listing, 5664 - Unit 1 Combustion Turbine Maintenance and Component Repairs for the Redding Power Plant (Addendum No. 1 issued 01/09/2026), was removed along with entries dated December 19, 2025 and January 22, 2026.
    Difference
    5%
    Check dated 2026-01-28T00:48:18.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Difference
    4%
    Check dated 2026-01-20T21:38:03.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    New bid opportunities have been posted: 5666 for Construction Management Services for the Westside Road Bridge project (Open Jan 13, 2026; Close Feb 13, 2026) and 5668 for a Heated Blower Regeneration Desiccant Air Dryer (Open Jan 8, 2026; Close Jan 29, 2026). The listing for 5664 - Unit 1 Combustion Turbine Maintenance and Component Repairs was removed from the Bid Opportunities page.
    Difference
    3%
    Check dated 2026-01-13T18:32:59.000Z thumbnail image

Stay in the know with updates to Redding, California RFPs

Enter your email address, and we'll notify you when there's something new on the Redding, California RFPs page.