Stay updated on Rochester, New Hampshire RFPs
Sign up to get notified when there's something new on the Rochester, New Hampshire RFPs page.

Latest updates to the Rochester, New Hampshire RFPs page
- Check7 days agoChange DetectedRemoved a specific bid entry for the Salmon Falls Sewer Pump Station Upgrade with its start and end dates/times; this reduces visible project bidding details on the page.SummaryDifference5%

- Check14 days agoNo Change Detected
- Check21 days agoChange DetectedDeleted a specific bid entry for floorplan data development with its date/time window; this removes that bid from the page content.SummaryDifference3%

- Check35 days agoChange DetectedAdded a concrete bid entry for the Salmon Falls Sewer Pump Station Upgrade with its timeframe. No deletions were made.SummaryDifference4%

- Check43 days agoChange DetectedReplaces Bid 25-17 (Sewer System Master Plan Year 5 I/I Construction Phase) with Bid 26-06 (Floorplan Data Development) and updates the bid window to 09/04/2025 8:00am – 10/01/2025 5:00pm; the old bid and its dates are removed.SummaryDifference7%

- Check120 days agoChange DetectedThe page has added a new bid for the Sewer System Master Plan Year 5 I/I Construction Phase with specific time slots for bidding, while it has removed two previous bids related to chemicals for wastewater treatment and a water main replacement.SummaryDifference11%

- Check142 days agoChange DetectedThe page has removed two significant bids related to engineering services and maintenance for stormwater treatment practices, including their respective dates and times.SummaryDifference5%

Stay in the know with updates to Rochester, New Hampshire RFPs
Enter your email address, and we'll notify you when there's something new on the Rochester, New Hampshire RFPs page.