Stay updated on Sioux City, Iowa RFPs

Sign up to get notified when there's something new on the Sioux City, Iowa RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Sioux City, Iowa RFPs page

  1. Check
    6 days ago
    Change Detected
    Summary
    Added bid notices for four new projects: Martin Luther King Jr. Transportation Center Elevator Modernization, Seger Avenue Water Main Replacement, 1110 Larsen Park Road Flood Repairs, and Wastewater Treatment Plant Digester Cleaning. Removed several older bid notices including the demolition of 2812 Niobrara Avenue, the 2025 Annual Sidewalk Program, Isabella Square and Lyons Park area HMA resurfacing, and the online payment maintenance notice.
    Difference
    4%
    Check dated 2026-04-17T02:36:29.000Z thumbnail image
  2. Check
    13 days ago
    Change Detected
    Summary
    New bid notices have been added for the perimeter fence improvement, FY2026 sidewalk ramp, Taxiway C rehabilitation, and Lorraine Avenue resurfacing. A maintenance window informs that online payments will be unavailable during the specified period; several existing bid entries have been removed.
    Difference
    4%
    Check dated 2026-04-09T21:34:22.000Z thumbnail image
  3. Check
    21 days ago
    Change Detected
    Summary
    Added Housing Moving Project to the bid opportunities on the Projects Out for Bid page.
    Difference
    0.3%
    Check dated 2026-04-02T15:31:04.000Z thumbnail image
  4. Check
    28 days ago
    Change Detected
    Summary
    Added notices for the Park View Boulevard Water Main Replacement project (7528-519-164), Gordon Drive Water Main and Sanitary Sewer Early Relocation package (7373-719-379), and a Fire Hydrant Painting Project. Removed notices include the demolition of 1031 Morningside Avenue, South Apron Reconstruction Phase 2, Police Department Storage Facility, FY2026 Utility Lining, RFP for Wastewater Treatment Plant Environmental Audit, Central Maintenance Garage – Vehicle and CO/NO2 Exhaust, Sioux City Fire Training Roof, Maintenance & Garbage Collection Services, FY2026 Fiber Optic Project, Pulaski Park Drainage Improvement, Big Sioux River Erosion Repair, House Moving Project Sioux City, and Sioux City WWTP Project Phase 1 RFQ.
    Difference
    5%
    Check dated 2026-03-26T11:36:17.000Z thumbnail image
  5. Check
    35 days ago
    Change Detected
    Summary
    Added two new bid notices: the demolition of 2812 Niobrara Avenue and the Isabella Square/Lyons Park HMA resurfacing project. Removed two notices: the FY2026 annual manhole replacement and the 2026 Lyons Park sidewalk improvements.
    Difference
    5%
    Check dated 2026-03-19T04:48:23.000Z thumbnail image
  6. Check
    42 days ago
    Change Detected
    Summary
    The bid listing adds Asphalt Hauling and RFP #320 Parking Facilities Operator, and removes Pulaski Park Stormwater Pipe Replacement and the Isabella Square and Lyons Park Area HMA Resurfacing project.
    Difference
    1%
    Check dated 2026-03-12T00:27:28.000Z thumbnail image

Stay in the know with updates to Sioux City, Iowa RFPs

Enter your email address, and we'll notify you when there's something new on the Sioux City, Iowa RFPs page.