- Check6 days agoChange DetectedThe Open Public Opportunities list was updated: the Santa Rosa At-Grade Crossing Improvements RFQ entry and its metadata were removed, the 'View Opportunity' actions were removed from entries, and new numeric identifiers (3 and 26) were added.SummaryDifference5%

- Check13 days agoChange DetectedA new open opportunity CV-BB-26-004 for St. Vincent's Reinforced Concrete Box Culvert (RBC) Reinforced Fill (ML MP 22.18 & 22.28) was added under Engineering with a close date of Jul 16th 2026, 2:00 PM PDT (33 days left). The previous opportunity OP-EQ-26-013 for OEM solenoid valves and pressure switches in Vehicle Maintenance was deleted.SummaryDifference7%

- Check20 days agoChange DetectedThree new opportunities (IDs 2, 11, 17) were added to the Public Opportunities listing. Three existing opportunities (IDs 9, 18, 24) were removed.SummaryDifference2%

- Check27 days agoChange DetectedNew opportunities (IDs 9, 18, and 24) are added to the Procurement Portal. The Crane Creek Fiddleneck Drainage Riparian Enhancement Project is listed with the correct spelling, replacing the previous misspelling.SummaryDifference2%

- Check35 days agoChange DetectedTwo new opportunities have been added to the Procurement Portal: EV-BB-26-001 Crane Creek Fiddleneck Drainage Riparian Enhancement Project (Engineering) with an Open status and a June 23, 2026 deadline, and OP-EQ-26-013 Notice of Intent to Award for the Purchase of OEM Solenoid Valves and Pressure Switches (Vehicle Maintenance) with its own deadline. The old 33-day counter was removed, aligning the listing with the new opportunities and deadlines.SummaryDifference10%

- Check42 days agoChange DetectedThe procurement opportunities list shows updated deadlines: the first item closes June 17, 2026, and the days left are updated to 33, reflecting an extension of the bid window. This indicates bidders have more time to prepare and submit their proposals.SummaryDifference5%