Stay updated on Spearfish, South Dakota RFPs

Sign up to get notified when there's something new on the Spearfish, South Dakota RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Spearfish, South Dakota RFPs page

  1. Check
    2 days ago
    No Change Detected
  2. Check
    10 days ago
    Change Detected
    Summary
    Added Bid Opportunity 2026 Annual Crosswalk, Stop Bar & Turn Arrow Pavement Marking (Bid No. 26-21) with opening date 4/29/2026 1:30 PM. Removed Bid No. 26-22 2026 Mainline Pavement Markings.
    Difference
    1%
    Check dated 2026-04-16T10:36:09.000Z thumbnail image
  3. Check
    17 days ago
    Change Detected
    Summary
    Added 1 new bid to Bid Opportunities. Removed several listing details from the bid entries (e.g., Open, Closes, Status, Read on), which may change how deadlines are displayed.
    Difference
    3%
    Check dated 2026-04-09T08:17:10.000Z thumbnail image
  4. Check
    24 days ago
    Change Detected
    Summary
    Added Bid No. 26-22: 2026 Mainline Pavement Markings with a 4/15/2026 deadline. Removed Bid No. 25-12: Sawmill Rd with a 4/1/2026 deadline.
    Difference
    1.0%
    Check dated 2026-04-02T00:33:40.000Z thumbnail image
  5. Check
    31 days ago
    Change Detected
    Summary
    Added Bid 26-02: 2026 CIPP Lining (4,252 LF of 8” CIPP lining) with bid closing on 4/8/2026. Removed Bid 26-04: Mtn View Elem Alley Waterline (water main and alley reconstruction) with closing 3/25/2026.
    Difference
    1.0%
    Check dated 2026-03-25T20:50:14.000Z thumbnail image
  6. Check
    38 days ago
    Change Detected
    Summary
    A new bid entry was added to the Bid Opportunities list, increasing the total from 1 to 2. The new entry is Sawmill Rd (Bid No. 25-12) with project details and a Read on link.
    Difference
    3%
    Check dated 2026-03-18T17:53:29.000Z thumbnail image
  7. Check
    45 days ago
    Change Detected
    Summary
    Added Bid No. 26-04: Mtn View Elem Alley Waterline with reconstruction of a water main and alley work, including ADA sidewalk; closes 3/25/2026 1:30 PM. Removed Bid No. 2025-13: Fire Training Tower Project Lot 3 of Tract R False Bottom Addition; closing date was 3/10/2026 1:30 PM.
    Difference
    1%
    Check dated 2026-03-11T14:44:09.000Z thumbnail image

Stay in the know with updates to Spearfish, South Dakota RFPs

Enter your email address, and we'll notify you when there's something new on the Spearfish, South Dakota RFPs page.