Stay updated on Spearfish, South Dakota RFPs
Sign up to get notified when there's something new on the Spearfish, South Dakota RFPs page.

Latest updates to the Spearfish, South Dakota RFPs page
- Check2 days agoNo Change Detected
- Check10 days agoChange DetectedAdded Bid Opportunity 2026 Annual Crosswalk, Stop Bar & Turn Arrow Pavement Marking (Bid No. 26-21) with opening date 4/29/2026 1:30 PM. Removed Bid No. 26-22 2026 Mainline Pavement Markings.SummaryDifference1%

- Check17 days agoChange DetectedAdded 1 new bid to Bid Opportunities. Removed several listing details from the bid entries (e.g., Open, Closes, Status, Read on), which may change how deadlines are displayed.SummaryDifference3%

- Check24 days agoChange DetectedAdded Bid No. 26-22: 2026 Mainline Pavement Markings with a 4/15/2026 deadline. Removed Bid No. 25-12: Sawmill Rd with a 4/1/2026 deadline.SummaryDifference1.0%

- Check31 days agoChange DetectedAdded Bid 26-02: 2026 CIPP Lining (4,252 LF of 8” CIPP lining) with bid closing on 4/8/2026. Removed Bid 26-04: Mtn View Elem Alley Waterline (water main and alley reconstruction) with closing 3/25/2026.SummaryDifference1.0%

- Check38 days agoChange DetectedA new bid entry was added to the Bid Opportunities list, increasing the total from 1 to 2. The new entry is Sawmill Rd (Bid No. 25-12) with project details and a Read on link.SummaryDifference3%

- Check45 days agoChange DetectedAdded Bid No. 26-04: Mtn View Elem Alley Waterline with reconstruction of a water main and alley work, including ADA sidewalk; closes 3/25/2026 1:30 PM. Removed Bid No. 2025-13: Fire Training Tower Project Lot 3 of Tract R False Bottom Addition; closing date was 3/10/2026 1:30 PM.SummaryDifference1%

Stay in the know with updates to Spearfish, South Dakota RFPs
Enter your email address, and we'll notify you when there's something new on the Spearfish, South Dakota RFPs page.