Stay updated on Titusville, Florida RFPs

Sign up to get notified when there's something new on the Titusville, Florida RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Titusville, Florida RFPs page

  1. Check
    5 days ago
    Change Detected
    Summary
    Added a new bid posting: First Avenue Sidewalk & Roadway Improvements Project - FY26 CDBG (CN-26-B-028/MG) with due date April 7, 2026. Removed the Area III Wellfield - 500 KW Diesel Generator Replacement (CN-26-B-024/MG) due March 4, 2026.
    Difference
    1%
    Check dated 2026-03-11T17:32:46.000Z thumbnail image
  2. Check
    12 days ago
    Change Detected
    Summary
    A new bid CN-26-B-026/LR for Knox McRae Master Pump Station Improvements was added with its due date and addendum. One bid listing was removed from the list.
    Difference
    4%
    Check dated 2026-03-04T14:39:07.000Z thumbnail image
  3. Check
    19 days ago
    Change Detected
    Summary
    A new bid listing was added, while two existing bid postings (Knox McRae Master Pump Station Improvements and Blue Heron WRF Filter Upgrade) were removed.
    Difference
    4%
    Check dated 2026-02-25T10:27:31.000Z thumbnail image
  4. Check
    27 days ago
    Change Detected
    Summary
    An Emergency Alert banner and a Precautionary Boil Water Notice for South Street were added. The Blue Heron WRF Filter Upgrade bid entry was updated with a new addendum, and the Boil Water Notice Rescinded notice was removed.
    Difference
    0.5%
    Check dated 2026-02-18T07:44:18.000Z thumbnail image
  5. Check
    33 days ago
    Change Detected
    Summary
    CN-26-B-024/MG bid posting now includes addenda and a due date, while non-mandatory pre-bid information is removed; a Read On link appears with the listing.
    Difference
    1.0%
    Check dated 2026-02-11T10:24:15.000Z thumbnail image
  6. Check
    40 days ago
    Change Detected
    Summary
    New bid postings were added, including CN-26-B-024/MG: AREA III WELLFIELD - 500 KW DIESEL GENERATOR REPLACEMENT with a due date of March 4, 2026, and CN-26-B-025/LR: BLUE HERON WRF FILTER UPGRADE with a due date of February 23, 2026. The listing now displays status and a Read On link for details.
    Difference
    2%
    Check dated 2026-02-04T10:17:53.000Z thumbnail image

Stay in the know with updates to Titusville, Florida RFPs

Enter your email address, and we'll notify you when there's something new on the Titusville, Florida RFPs page.