Stay updated on Urban One Builders Job Board
Sign up to get notified when there's something new on the Urban One Builders Job Board page.

Latest updates to the Urban One Builders Job Board page
- Check2 days agoNo Change Detected
- Check9 days agoNo Change Detected
- Check50 days agoChange DetectedA new VDC/BIM Manager listing has been added to the Current Openings. The listing includes Vancouver, British Columbia (Preconstruction BC) and is marked as Full-Time.SummaryDifference7%

- Check57 days agoChange DetectedSenior Project Manager listing and its associated location and employment type details were removed from the current openings. The page now displays only the Director of Estimating posting, resulting in fewer listings and less location-specific information shown to applicants.SummaryDifference5%

- Check64 days agoChange DetectedThe careers page listings were shortened by removing the Proposal Manager role and several location/employment-type qualifiers, resulting in briefer postings that emphasize only the role name and core details.SummaryDifference4%

- Check85 days agoChange DetectedThe openings list now includes new roles (Proposal Manager, Director of Estimating) with associated location details (Vancouver, British Columbia) and qualifiers (Full-Time, Preconstruction BC, Estimating), expanding the opportunities shown on the careers page. This provides more context for applicants about where and in what capacity these roles exist.SummaryDifference14%

- Check128 days agoChange DetectedThe Construction Safety Officer listing has been removed from Current Openings, and the associated location and employment-type details no longer appear with that posting. Only the Senior Project Manager opening remains visible.SummaryDifference5%

- Check142 days agoChange DetectedAdds a new Construction Safety Officer opening to the Current Openings list. The entry shows a Full-Time position in Safety BC located in Richmond, British Columbia.SummaryDifference7%

Stay in the know with updates to Urban One Builders Job Board
Enter your email address, and we'll notify you when there's something new on the Urban One Builders Job Board page.