Stay updated on Utah Department of Transportation RFPs
Sign up to get notified when there's something new on the Utah Department of Transportation RFPs page.

Latest updates to the Utah Department of Transportation RFPs page
- Check5 days agoNo Change Detected
- Check12 days agoChange DetectedThe two 2027–2031 Contractor Pool opportunities have been removed from the open-opportunities list. The portal now indicates that there are no open projects.SummaryDifference9%

- Check19 days agoChange DetectedThe UDOT contractor pool opportunities for Bridge and Structure Damage and Geologic Hazards now show 4 days remaining instead of 11, indicating that their submission deadlines are approaching.SummaryDifference1%

- Check26 days agoChange DetectedThe opportunity list now shows two 2027–2031 Contractor Pool solicitations: WD1 for bridge and structure damage and WD2 for geologic hazards, both closing October 14, 2026. Several previous opportunities, including a US-89/SR-12 project and 2024–2028 Structures Pool submissions, are no longer listed.SummaryDifference10%

- Check33 days agoChange DetectedTwo new Days Left values (5 and 18) were added and two previous values (12 and 25) were removed across the Open Opportunities list, indicating revised countdowns to close dates for multiple opportunities.SummaryDifference3%

- Check40 days agoChange DetectedAdded a new Open opportunity: Streamlined Solicitation - UTN: US-89 & SR-12; Panguitch to Red Canyon Trail - PE (PIN 23498) with a close date of Oct 1st 2026, Open status, and 25 days left (View Opportunity). Removed the numbers 19 and 32 from the listing.SummaryDifference6%

- Check47 days agoChange DetectedDays Left for two open opportunities were updated. The remaining days changed from 26 and 39 to 19 and 32, respectively, reflecting new bid deadlines.SummaryDifference2%

Stay in the know with updates to Utah Department of Transportation RFPs
Enter your email address, and we'll notify you when there's something new on the Utah Department of Transportation RFPs page.