Stay updated on Utah Department of Transportation RFPs

Sign up to get notified when there's something new on the Utah Department of Transportation RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Utah Department of Transportation RFPs page

  1. Check
    5 days ago
    Change Detected
    Summary
    The time slot for the Open PIN 20317 Streamlined Solicitation for the Kay’s Creek Trail Overpass at Layton FrontRunner has been updated to July 3rd, 2025, at 11:00 AM MDT, replacing the previous time of July 2nd, 2025.
    Difference
    5%
    Check dated 2025-06-27T00:28:48.000Z thumbnail image
  2. Check
    12 days ago
    Change Detected
    Summary
    The webpage has added several new projects related to the 2025-2030 General Engineering Services Pool, including specific engineering services and their opening dates. Additionally, a previous project PIN 19507 and a solicitation for the I-84/US-89 Interchange Reconstruction have been removed.
    Difference
    6%
    Check dated 2025-06-19T19:27:44.000Z thumbnail image
  3. Check
    19 days ago
    No Change Detected
  4. Check
    26 days ago
    Change Detected
    Summary
    The page has updated its project information, replacing the Moab Cyn Pathway project with the I-84/US-89 Interchange Reconstruction project, along with a new date and time for the latter.
    Difference
    1%
    Check dated 2025-06-05T11:08:22.000Z thumbnail image
  5. Check
    34 days ago
    Change Detected
    Summary
    The web page has removed two significant project listings related to bridge replacement and rail transit support, both scheduled for May 27th, 2025.
    Difference
    7%
    Check dated 2025-05-29T05:52:00.000Z thumbnail image
  6. Check
    41 days ago
    Change Detected
    Summary
    The page has updated the date and time for an event from May 26th to May 27th, 2025, and added a new event related to the Moab Cyn Pathway and Raptor St Park scheduled for May 29th, 2025.
    Difference
    3%
    Check dated 2025-05-22T02:21:55.000Z thumbnail image
  7. Check
    55 days ago
    Change Detected
    Summary
    The page now includes information about the I-84 Bridge Replacement project at Blue Creek and Howell, with a new preconstruction engineering solicitation date set for May 27th, 2025, at 11:00 AM MDT. The previous solicitation for rail transit support has been removed.
    Difference
    7%
    Check dated 2025-05-07T19:08:28.000Z thumbnail image

Stay in the know with updates to Utah Department of Transportation RFPs

Enter your email address, and we'll notify you when there's something new on the Utah Department of Transportation RFPs page.