Stay updated on Utah Department of Transportation RFPs
Sign up to get notified when there's something new on the Utah Department of Transportation RFPs page.

Latest updates to the Utah Department of Transportation RFPs page
- Check6 days agoChange DetectedTwo small UI/list updates were made on the Procurement Portal: two items were added and two removed from the list. To avoid being alerted by small changes, set an alert condition by clicking below.SummaryDifference3%

- Check13 days agoChange DetectedTwo new opportunities (IDs 8 and 10) were added and two opportunities (IDs 15 and 24) were removed from the Open Public Opportunities list on the Procurement Portal. The displayed opportunities now reflect the updated set and deadlines.SummaryDifference3%

- Check20 days agoChange DetectedNew procurement opportunities were added (PIN 16388 Standard Solicitation - SR-224; Capacity & Kimballs Junction Improvements; PIN 23164 Streamlined Solicitation - Hanksville Airport 5-Year Planning Update) with their close dates, and several existing opportunities (PIN 22623, PIN 20841, PIN 22341) were removed.SummaryDifference11%

- Check27 days agoChange DetectedAdded a new procurement opportunity: PIN 22679 - Streamlined Solicitation - SR-39 RR Grade Separated Overpass - PE, with a close date of Jan 15, 2026 11:00 AM MST and a View Opportunity action. Removed entries 10, 14, and 29 from the list.SummaryDifference6%

- Check34 days agoChange DetectedNew opportunities have been added: PIN 22111 (Streamlined Solicitation - SR-24 over Sulphur Creek, PE Services Requested) and PIN 20841 (Streamlined Solicitation - SR-201; I-80 to 9200 West, PE Services). Several existing opportunities were removed, including PIN 23077 (Traffic Engineering Study Preparation) and the 'Replace (F 153) Long Bridge over Weber River - Program Management Services'.SummaryDifference9%

- Check41 days agoChange DetectedTwo new opportunities were added: PIN 22341 - Replace (F 153) Long Bridge over Weber River (Standard Solicitation - Program Management Services) and PIN 22623 - Streamlined Solicitation - Springville 1600 S Phase 3, 1200 W to SR-51 - CEM Services, with close dates Dec 22, 2025 and Dec 11, 2025 respectively. PIN 22077 - Streamlined Solicitation - Parkin Overpass / Bamberger Railroad Bridge; 500 W - Preconstruction Engineering was removed (closing date Nov 24, 2025).SummaryDifference9%

Stay in the know with updates to Utah Department of Transportation RFPs
Enter your email address, and we'll notify you when there's something new on the Utah Department of Transportation RFPs page.