Stay updated on Washington Union Elementary School District, California RFPs
Sign up to get notified when there's something new on the Washington Union Elementary School District, California RFPs page.

Latest updates to the Washington Union Elementary School District, California RFPs page
- Check7 days agoNo Change Detected
- Check14 days agoNo Change Detected
- Check21 days agoChange DetectedThe page removed multiple documents for the 2627-7 Secure Entry project and the 2627-3 Bridgeway Island Hardcourt project, including Addendum No.01, Drawings, Specifications, and Project Manuals. This reduces the available project documentation on the Current RFPs and Projects page and may affect bidders' ability to review scope and requirements.SummaryDifference2%

- Check28 days agoNo Change Detected
- Check36 days agoChange DetectedAdded 2627-3 Bridgeway Island Hardcourt Addendum No. 1 to the Bridgeway Island Hardcourt project documents. This expands the procurement materials available for bidders reviewing the Current RFPs and Projects page.SummaryDifference0.2%

- Check43 days agoChange DetectedThe page’s list of current RFPs/projects was refreshed: an “Addendum No.01” for the 2627-7 Secure Entry Project was added, while related addendum and document links for the 2627-6 RCHS Tennis Court and 2627-1 Exterior Paint Refresh projects were removed.SummaryDifference2%

- Check57 days agoChange DetectedAdded Addendum No.1 for the 2627-6 RCHS Tennis Court Replacement Project to the Current RFPs and Projects page, updating the list of documents.SummaryDifference0.2%

- Check64 days agoChange DetectedAdded: RFQ-PERFORMING ARTS CENTER PROJECT-Alternative Design Build Services Addendum No.01; 2627-1 Exterior Paint Refresh Addendum No.1; 2627-7 Secure Entry Project, plus its Project Manual, Drawings, and Door Hardware Specs. Removed: 2627-5 Yolo HS LED Upgrade-related documents (Scope of Work, Project Manual, Materials List).SummaryDifference2%

- Check79 days agoChange DetectedAdded four new documents under the 2627-5 Yolo HS Led Upgrade project: Materials List, Scope of Work, Project Manual, and a dedicated LED Upgrade entry.SummaryDifference1.0%

Stay in the know with updates to Washington Union Elementary School District, California RFPs
Enter your email address, and we'll notify you when there's something new on the Washington Union Elementary School District, California RFPs page.