Stay updated on Yankton, South Dakota RFPs

Sign up to get notified when there's something new on the Yankton, South Dakota RFPs page.
Latest website image capture
Clouds background image

Latest updates to the Yankton, South Dakota RFPs page

  1. Check
    4 days ago
    Change Detected
    Summary
    New bid entry 2026-020: Cold Applied Plastic Pavement Marking Installation was added (Starting 03/26/2026, Closing 04/16/2026). The bid 2025-026: Annual Supply Of Bulk De-Icing Salt was removed, updating the total number of items from 22 to 23.
    Difference
    3%
    Check dated 2026-04-02T15:28:12.000Z thumbnail image
  2. Check
    11 days ago
    Change Detected
    Summary
    Added two new bids: 2026-003 Cedar Street 20th Street to 21st Street Street & Utility Reconstruction (Starting 03/26/2026; Closing 04/16/2026) and 2026-006 10th Street Pavement Replacement Maple Street to Locust Street (Starting 04/14/2026; Closing 04/14/2026). Removed two bids: 2025-021 Annual Supply of Transport - Tankwagon Petroleum Products (posted 05/29/2025; closed 06/12/2025) and 2025-061225 Marne Creek Sewer Crossing Improvements (posted 05/01/2025).
    Difference
    6%
    Check dated 2026-03-26T11:36:34.000Z thumbnail image
  3. Check
    18 days ago
    Change Detected
    Summary
    Added new bid entry: Kellen Gross Drive Pavement Replacement 21st Street to 23rd Street. Removed bid entry: Kellen Gross Drive Pavement Replacement 20th Street to 21st Street.
    Difference
    3%
    Check dated 2026-03-19T04:52:06.000Z thumbnail image
  4. Check
    25 days ago
    Change Detected
    Summary
    New Bid & RFP postings have been added, including 2nd Street & Capital Street - Parking Lot Construction and Kellen Gross Drive Pavement Replacement, with their respective closing dates. The Package Off-Sale Liquor License posting was removed.
    Difference
    5%
    Check dated 2026-03-12T02:15:03.000Z thumbnail image
  5. Check
    32 days ago
    Change Detected
    Summary
    Removed the 2025-004 bid entry (Douglas Avenue - Water Main and Street Reconstruction) from the Bid & RFP Posts List, along with its posting date and status.
    Difference
    2%
    Check dated 2026-03-05T01:01:09.000Z thumbnail image
  6. Check
    39 days ago
    Change Detected
    Summary
    Added new RFP entry 2026-001: 3rd Street Reconstruction Mulberry Street to Picotte Street, starting 02/19/2026 and closing 03/12/2026.
    Difference
    2%
    Check dated 2026-02-25T20:20:33.000Z thumbnail image

Stay in the know with updates to Yankton, South Dakota RFPs

Enter your email address, and we'll notify you when there's something new on the Yankton, South Dakota RFPs page.